The Powerfully Green Process
The solar installation process requires us to work hand in hand with your city and energy provider. Powerfully Green Solar is dedicated to moving you through this process with ease and efficiency at every turn.
The First Steps
1
2
3
Permitting & Interconnections
When it comes to permitting and interconnection, our team works directly with your energy provider and your specific city to get you through the process as swiftly and smoothly as possible. This step typically takes the longest, usually between 5 to 7 weeks.
Interconnection Application
City & State Permits
Electrical and building permits are required in most cities. We apply for permits in concert with the interconnection application process.
Installing Your System
The Final Steps: Inspection & Testing
1
2
3
System Monitoring
This is the last step in the solar installation process. Within 48 hours of your system passing the witness test a member of Powerfully Green Solar, will contact you on how to monitor your solar production.
Once you understand system monitoring, it’s smooth sailing from here on out and you can sit back, relax and let the sun power your home!